Riedweg New Furnace Pictures


Thumbnail 080704-005.jpg Thumbnail 080704-006.jpg Thumbnail 080704-007.jpg Thumbnail 080704-008.jpg Thumbnail 080704-009.jpg
Prep'ing hot water tank Cutting exhaust port Exhaust port Bottom portion after cutting top off Top portion
Thumbnail 080704-010.jpg Thumbnail 080706-001.jpg Thumbnail 080706-002.jpg Thumbnail 080706-005.jpg Thumbnail 080706-006.jpg
Welded on burner port Guestimating caster layout Welding caster bracket Finished caster brackets Drain and exhaust port forms
Thumbnail 080721-001.jpg Thumbnail 080721-002.jpg Thumbnail 080721-003.jpg Thumbnail 080721-004.jpg Thumbnail 080721-006.jpg
Eddie Tracy came over to learn about welding Eddie shows off his nameplate Eddie's first welding project Detail of trailer jack used to raise lid Detail of trailer jack used to raise lid
Thumbnail 080721-007.jpg Thumbnail 080721-009.jpg Thumbnail 080721-012.jpg Thumbnail 080721-013.jpg Thumbnail 080721-014.jpg
Fitting furnace lid Fitting furnace lid Fitting furnace lid Dad helping cast the refractory Lid after pouring refractory
Thumbnail 080721-015.jpg Thumbnail 080721-016.jpg Thumbnail 080721-017.jpg Thumbnail 080721-018.jpg Thumbnail 080721-019.jpg
Base after pouring refractory Base after pouring refractory Base and lid during curing Outer refractory form Inner refractory form w/ breakaway (allegedly) middle piece
Thumbnail 080721-020.jpg Thumbnail 080721-021.jpg Thumbnail 080721-022.jpg Thumbnail 080721-023.jpg Thumbnail 080801-002.jpg
Rich Libby inspecting furnace (and lunch) Lid after curing Base with form partially removed (had to chisel bottom out) Furnace ready to fire
Thumbnail 080801-003.jpg Thumbnail 080801-004.jpg Thumbnail 080801-005.jpg Thumbnail 080801-006.jpg Thumbnail 080801-007.jpg
Thumbnail 080801-008.jpg Thumbnail 080801-009.jpg

created with llgal